Oversight of Design and Engineering Firms' Indirect Costs Claimed on Federal-Aid Grants: Federal Highway Administration

· DIANE Publishing
E-raamat
32
lehekülge

Teave selle e-raamatu kohta

This report provides the results of the Dept. of Transportation (DoT) Office of Inspector General¿s implementation of Section 307 of the Nat. Highway Systems Designation Act (NHSDA). These provisions are intended, in part, to ensure that design and engineering (D&E) firms¿ indirect cost rates do not contain unallowable costs. The OIG began this audit because of concerns expressed by state transportation officials regarding the allowability of executive compensation and other indirect costs at some D&E firms. Audit objectives were to evaluate the implementation of NHSDA Section 307 audit requirements, and test the allowability of executive compensation and other high risk indirect cost elements billed by D&E firms on state DoT contracts.

Avastage rohkem

Hinnake seda e-raamatut

Andke meile teada, mida te arvate.

Lugemisteave

Nutitelefonid ja tahvelarvutid
Installige rakendus Google Play raamatud Androidile ja iPadile/iPhone'ile. See sünkroonitakse automaatselt teie kontoga ja see võimaldab teil asukohast olenemata lugeda nii võrgus kui ka võrguühenduseta.
Sülearvutid ja arvutid
Google Playst ostetud audioraamatuid saab kuulata arvuti veebibrauseris.
E-lugerid ja muud seadmed
E-tindi seadmetes (nt Kobo e-lugerid) lugemiseks peate faili alla laadima ja selle oma seadmesse üle kandma. Failide toetatud e-lugeritesse teisaldamiseks järgige üksikasjalikke abikeskuse juhiseid.