Courtney Pelzel, RCDD, founder of ASAP Computer Services in San Antonio, Texas, documents the exact procedure the company's technicians use in the field. Forty-eight photographs follow one termination from the sealed kit to the finished connector, with one plain instruction per step.
This short guide covers:
- What is in the FAST SC kit and the four tools you need
- Stripping the outer jacket, cutting the Kevlar, and stripping the 900 µm buffer
- Removing the 250 µm coating with three hole fiber strippers
- Cleaning and cleaving the fiber to the 10.5 mm cleave length
- Preparing the connector, inserting the fiber, and releasing the wedge
- Basic fiber safety at the work area
- A one-page quick reference for the tool bag
The connector pictured is the singlemode FAST-SC-SMAU for 0.9 mm and 0.25 mm fiber. No epoxy, no polishing, and no fusion splicer are involved, only hand tools and a precision cleaver.
Written for low-voltage installers, network technicians, and IT staff who terminate a small number of fiber connectors and want a repeatable method.
This is an independent guide and is not affiliated with or endorsed by AFL. Always follow the instructions packaged with the connector.
Courtney Pelzel is the founder and Managing Member of ASAP Computer Services, a managed IT services and network installation company in San Antonio, Texas, in business since 1999. Pelzel is a BICSI Registered Communications Distribution Designer (RCDD #356281) and BICSI Installer 1, and holds CompTIA Security+, Network+, and A+, the Microsoft Certified: Security, Compliance, and Identity Fundamentals (SC-900) certification, Fortinet NSE 1 and NSE 2, and EXFO fiber certifications. As the company's designated security officer, Pelzel is personally accountable for security on every client engagement. Pelzel writes short, practical field guides for technicians and IT managers, drawn from more than 25 years of designing, installing, and managing business technology from the cabling up.