第二次検定/実地/1級電気工事施工管理過去問題/令和6年~

5+
Downloads
Content rating
Everyone
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image

About this app

Contains information from the 2020 secondary examination to 2012 (practical).
This course is for those who aim to pass the exam by past exams.
●R6~H24/Experience description ⇒ R5~H24 has a description image.
●R6-H24/Specific content of words ⇒ Examples of descriptions are provided.
●R6~H24/Technical content of terms ⇒ Examples of descriptions are provided.
●R6-R3/Calculation questions ⇒ For each question, you can check the answer immediately by clicking [Question ⇒ Answer].
●R6~H21/Legal ⇒ For each question, you can check the answer immediately by clicking [Question ⇒ Answer].
Start studying little by little during your commute on the train or bus or during your breaks.
*2nd year of Reiwa 6, 2nd year of Reiwa 5th, 2nd year of Reiwa 4th, 2nd year of Reiwa 3rd year, 2020, 2020, 2018, 2017, 2016, 2015, 2014, 2013, 2012
The following questions are included.
[Main contents]
●R5~H24/Experience description “Crash accident/Flying accident” “Electric shock accident” “Process control” “Quality control”/Description image
●R6~H24/Specific content of phrases
Conduit construction
Construction of synthetic resin pipe (PF pipe)
Equipment installation
Wire connection
Connection between wires
Material management
Connecting wires to the panel
Working with an aerial work vehicle
Work close to high-voltage live wires
Work inside the underground pit
Working in oxygen deficient areas
Power outage work
drilling work
Excavation work using construction machinery
Earth excavation work
Yang heavy work with heavy machinery
Lifting work using cranes, etc.
Equipment installation/heavy equipment installation
High voltage power outage work
●R6~H24/Technical content of terms
Measures to improve thermal efficiency of steam power generation
New 4K8K satellite broadcasting joint reception equipment
hydropower water turbine generator
DC interconnection of power system
Lighting common transformer
R-type receiver for automatic fire alarm equipment
Power system power storage equipment
1000BASE−T
metal halide lamp
Guidance light with flashing guidance sound device
Photoelectric separate type sensor
DC power transmission
High voltage power reception method
Catenary suspension type
Periodic control of traffic signals
equipotential bonding
BT feeding system
overhead tram line
fireproof wire
lighting rate
Steel core heat-resistant aluminum alloy stranded wire (TACSR)
Wear and prevention measures for electric railway contact wires
Arc extinguishing reactor grounding type
bus duct
Grid connection of solar power generation
Causes and countermeasures for spillover accidents in power transmission and distribution systems
Lightning damage countermeasures for overhead power lines
Substation phase adjustment equipment
Combined cycle power generation
Protection coordination of circuit breakers
induction heating
Flame detector for automatic fire alarm equipment
AT feeding method
electric railway signaling equipment
Tunnel entrance lighting
How to reduce ground resistance
LAN switching hub
AC uninterruptible power supply (UPS)
CB type cubicle type high voltage power receiving equipment
power demand control
Transmission line shunt reactor
Multi-conductor system for power transmission lines
scott transformers
steam power turbine generator
Train central control device (CTC)
Measures to prevent electrolytic corrosion on electric railways
Traffic signal sensitive control
Overcurrent relay (OCR) operation test
Class C grounding work
high pressure sodium lamp
●R6~R3/Calculation problems
"Line voltage" "Three-phase short circuit current" "Horizontal tension of electric wire"
*Problems for arrow type network processes before Problem 4/R2 are not included.
●R6~H21/Regulations
Updated on
Jul 29, 2025

Data safety

Safety starts with understanding how developers collect and share your data. Data privacy and security practices may vary based on your use, region, and age. The developer provided this information and may update it over time.
No data shared with third parties
Learn more about how developers declare sharing
No data collected
Learn more about how developers declare collection

What’s new

一部機種でのアップデートによる画面表示の不具合を修正致しました。
画面上部のタイトルバーをなくしました。

App support

About the developer
土居到生
soirupuranningu@gmail.com
前野町6丁目33−6 板橋区, 東京都 174-0063 Japan
undefined