Nepal Electricity Authority (NEA) was created on August 16, 1985 (Bhadra 1, 2042) under the Nepal Electricity Authority Act. 1984, through the merger of the Department of Electricity of Ministry of Water Resources, Nepal Electricity Corporation and related Development Boards.
The primary objective of NEA is to generate, transmit and distribute adequate, reliable and affordable power by planning, constructing, operating and maintaining all generation, transmission and distribution facilities in Nepal's power system both interconnected and isolated.
With this NEA Customer App, customer would be able to manage their meters and billings.
Date de mise à jour
11 yul 2024