1 GENERAL AND SITE FACILITIES
2 EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING
3 BRICK SOLING, CC, DPC ETC.
4 BRICK WORKS, PATENT STONE IN FLOOR AND FANCY
5 MOSAIC WORKS
6 TILES, MARBLE STONE AND GRANITE STONE WORKS
7 REINFORCED CEMENT CONCRETE (RCC) WORKS
8 M.S. FABRICATION AND CONSTRUCTION JOINT IN RCC WORKS
9 PILE WORKS AND PILE TEST
10 STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY
11 WOOD WORKS IN DOOR AND WINDOW FRAME,
12 DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER
13 WINDOW GRILL, VERANDAH GRILL & NETTING
14 ALUMINIUM DOOR, WINDOW FRAME AND GLASS WORKS
15 CEMENT PLASTER, FAIR-FACE PLASTER AND POINTING WORKS
16 PAINTING AND POLISHING
17 LIME TERRACING, ROOF TOP WATER PROOFING
18 FALSE CEILING, WALL PANELING
19 COLLAPSIBLE GATE, M.S. GATE, ROLLING SHUTTER ETC.
20 STAIR & VERANDAH RAILING AND STAIR NOSING
21 GRILL FENCING AND BARBED WIRE FENCING
22 MISCELLANEOUS ITEMS
23 FERROCEMENT WORKS
24 ROAD AND PAVEMENT WORKS
25 ARBORICULTURE WORKS
26 SANITARY & WATER SUPPLY WORKS
27 DEEP TUBE-WELL
28 GAS CONNECTION WORKS
29 TERMITE TREATMENT WORKS
30 CONCRETE HOLLOW BLOCK, FACINGS AND PAVING STONE,
31 SUB-SOIL INVESTIGATION WORKS
32 REPAIR WORKS
33 COLUMN LOAD CAPACITY
34 IMPOSED LOAD ON COLUMN
35 CONCRETE MIX DESIGN
36 SINGLY BEAM DESIGN
37 FOOTING DESIGN
38 LAP LENGTH
39 SPT TO BEARING CAPACITY
40 UNIT CONVERTER
41 MATERIAL UNIT WEIGHT
42 STEEL BEAM
43 DICTIONARY
44 RAJUK
45 NUMBER TO WORD
46 QUIZ
47 FORMULA
48 RIGHT ANGLE
49 VAT AIT
50 AUTOCAD COMMAND
51 AREA CALCULATION
52 PILE ESTIMATE
53 REBAR WEIGHT
54 SHUTTER WEIGHT
55 ELECTRIC BILL
56 TALLY RECORD
Oxirgi yangilanish
8-yan, 2020