Skipi Draft Survey

Content rating
Everyone
0+
Downloads
Content rating
Everyone
Learn more
Screenshot image
Screenshot image
Screenshot image
Screenshot image

About this app

Skipi Draft Survey determines the quantity of cargo loaded or discharged on dry cargo ships by draft survey, in accordance with the UNECE Code of Uniform Standards and Procedures for the Performance of Draught Surveys of Coal Cargoes (1992) as applied in general practice. Intended for chief officers, masters and independent marine surveyors on bulk carriers and general cargo ships.

SURVEY PROCEDURE
1. Vessel particulars: select the vessel by IMO number from the shared database (over 5,300 vessels with hydrostatic particulars and draft mark positions), or photograph the hydrostatic tables of the trim and stability booklet. The recognised table is presented for verification before it is saved.
2. Initial survey: drafts forward, midships and aft, port and starboard; dock water density; ballast water, fresh water, fuel oil, diesel oil, lubricating oil and other deductibles.
3. Final survey: the same readings on completion of loading or discharging.
4. Calculation sheets: initial and final surveys side by side; cargo quantity obtained as the difference between net displacements.
5. Survey report: PDF with both calculation sheets and signature blocks for the vessel and the surveyor. Share the report or save the survey file to reopen it later.

CALCULATION
• Draft corrections from marks to perpendiculars; mean of means (quarter mean) draft
• Displacement from the hydrostatic particulars by linear interpolation, no extrapolation
• First and second trim corrections (LCF, TPC, MTC at ±50 cm)
• Correction for dock water density
• Deductibles and net displacement; cargo quantity = final net displacement − initial net displacement

VESSEL DATABASE
A vessel saved with its IMO number is added to the shared database for the next officer or surveyor who attends her. Hydrostatic tables are checked for consistency (drafts increasing, displacement not decreasing, positive TPC and MTC) before they are accepted.

NO ACCOUNT, NO ADVERTISING, NO TRACKING
Calculations are performed on the device. The network is used only to retrieve or publish vessel data and to recognise photographed tables. Suitable for phones and tablets.

Published by SKIPI LTD, London. Support: info@skipi.app
Loaded and discharged cargo quantity by draft survey for dry cargo ships
Updated on
Nov 26, 2026

Data safety

Safety starts with understanding how developers collect and share your data. Data privacy and security practices may vary based on your use, region, and age. The developer provided this information and may update it over time.
  • No data shared with third parties
    Learn more about how developers declare sharing
  • No data collected
    Learn more about how developers declare collection

What’s new

• Draft marks are set on a ship sketch: sliders, signed distances, and a second set of marks for deeper drafts.
• Drafts are entered on a plan of the ship; a figure outside the hydrostatic table is flagged.
• Net displacement and the full calculation (trim, density and other corrections) are shown for each survey without waiting for the other one.
• Port, date, surveyor and remarks in the report; your own file name.
• Find the ship by IMO first; add her only if she is not in the database.
Content rating
Everyone
Learn more

App support

About the developer
SKIPI LTD
info@skipi.app
182-184 High Street North East Ham LONDON E6 2JA United Kingdom
+357 97 617412