전기기술 스마트 가이드

10K+
Downloads
Content rating
Everyone
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image

About this app

Should be selected Substation Design capacity when entering the primary current, CT, Wave-type, non-current-limiting fuses, MOF specification, ASS settings, transformers, capacitor capacity, secondary current, secondary breaker capacity, the two kinds of ground wire thickness .
Load capacity condenser, asking for the current power factor, input power factor when the target capacitance required, jeolgamyul current, power loss reduction, it is possible to obtain an equivalent dose, single-phase capacitor and three phase capacitor value of the reactive power.
Depending on the construction method allowed when the wire current-wire method selection circuits can be selected wire size in advance. Construction methods note attached.

The tray area can be calculated according to the wire size.
KEPCO know the facility charges (processing, underground, added distance), and it can be seen that the use of pre-construction safety inspection, periodic inspection, electrical safety check amount.
Updated on
Nov 14, 2023

Data safety

Safety starts with understanding how developers collect and share your data. Data privacy and security practices may vary based on your use, region, and age. The developer provided this information and may update it over time.
No data shared with third parties
Learn more about how developers declare sharing
No data collected
Learn more about how developers declare collection

App support

Phone number
+82236627570
About the developer
부승용
boosy28@naver.com
강서로41길 38-6 단독 강서구, 서울특별시 07587 South Korea
undefined