Dholera

1K+
Downloads
Content rating
Everyone
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image
Screenshot image

About this app

WHAT IS DHOLERA SIR?
Dholera Special Investment Region (DSIR) is a Greenfield Industrial City planned and located approximately 100 km South West of Ahmedabad. The Government of Gujarat has created a legislative framework for the formation of a Special Investment Region (SIR) Act 2009. Under the act, a regional development authority for DSIR has been established.

The Dholera Special Investment Region Development Authority (DSIRDA) has the responsibility of planning and development of DSIR and will encompass the function of administering government land within DSIR. An Special Purpose Vehicle (SPV) named Dholera Industrial City Development Limited (DICDL) has been created between the Central Government (DMICDC Trust) and the State Government (DSIRDA) of Gujarat to implement the project. Delhi Mumbai Industrial Corridor Development Corporation Limited (DMICDC), a special purpose company, was incorporated to establish, promote and facilitate development of the DMIC Project.

Spanning approximately 920 sq km, encompassing 22 villages of the Dholera Taluka in the District of Ahmedabad, is envisaged to be bigger than the city of Ahmedabad. It is strategically located between the industrial cities of Ahmedabad, Baroda, Rajkot and Bhavnagar.

Dholera Industrial City will have its own self-sustaining eco-system consisting of economic drivers through industrialisation, utility & logistic infrastructure, Social Infrastructure including education, healthcare and other public amenities.

DMICDC, with the support of the Government of Gujarat, plans to create an economically and socially balanced new-age city with world-class infrastructure and highest quality-of-life standards with sustainability in the urban form including a sustainable urban transportation system within and mobile/efficient regional connectivity with neighbouring cities and the rest of the country.

It will be connected with Ahmedabad by a 6-lane access controlled expressway & MRTS (Metro Rail) in one common corridor providing seamless connectivity & Rail-Road transition as an effective means of transportation between the 2 cities.

An international airport is being developed to the North-East of DSIR by an SPV called Dholera International Airport Company Limited (DIACL). The airport has already received Environmental & Site clearance.

INDUSTRIES IN DSIR
Defence, Aviation, Electronics, High-Tech emerging technologies, Pharmaceuticals & Biotechnology, Heavy engineering, Auto & Auto ancillary, General Manufacturing, Agro & Food processing, Metals & Metallurgical products, etc. are the sectors identified with a high potential for Dholera Industrial City among other sectors. DSIR will be home to non-polluting industries, promoting a clean, green and sustainable urban development, which can contribute to the growth of the region and India.

The Government of Gujarat and DSIRDA has adopted the mechanism of Town Planning Schemes (TPS) to ensure the delivery of serviced land that can benefit the local population and the private sector. TP schemes are being implemented under the Gujarat Town Planning and Urban Development Act, 1976 (GTPUD). The developable area in DSIR is divided into six (6) Town Planning (TP) Schemes and all 6 draft schemes have been sanctioned. Town Planning Schemes 1 and 2 cover the development in Phase-I. TP 1 are spread over approximately 51 sq km or 12750 acres & TP 2 over 102 sq km or 25000 acres.

TP 1 will have approximately 186 km of road & TP 2, 340 km. Right of Way (ROW) varies from 12 m to 70 m i.e. 2 to 6 lane roads, have been master planned. Services and utilities running parallel to the roads & within the ROW will include Storm water drainage, Water supply, Sewerage/waste Water, Recycled Water, Power, Telecom and PNG.

INDUSTRIES IN DSIR PROJECT BACKGROUND - DSIR PHASE - I
The Development Plan for DSIR has been prepared and sanctioned by DSIRDA. Phase-I constitutes TP1 and TP2 covering 153 sq km.
Updated on
May 16, 2022

Data safety

Safety starts with understanding how developers collect and share your data. Data privacy and security practices may vary based on your use, region, and age. The developer provided this information and may update it over time.
No data shared with third parties
Learn more about how developers declare sharing
No data collected
Learn more about how developers declare collection
Data is encrypted in transit
Data can’t be deleted

What's new

- Updated Dashboard design