Content rating
Everyone
50+
Downloads
Content rating
Everyone
Learn more
Screenshot image
Screenshot image
Screenshot image
Screenshot image

About this app

The latest Mobile app from Laminaar Aviation Infotech Pvt. Ltd. is an extension of the ARMS® Suite. A state-of-the-art mobility solution that offers Airlines and Air Operators access to various Crew specific information from various sub- systems of the ARMS® Suite. Mobile app provides data to end-users in real time, as well as in offline mode. The same app can also enable the use of rapidly proliferating "Mobile Smartphone Devices" for other functions as well, e.g., for Cabin Crew, Engineering Crew, Load Masters and Ground staff etc., all controlled by a unified Backend Server infrastructure.
“AOM for TMA”- comprises the Server-side components and the Mobile-side (Client) application. The other big advantage of “AOM for TMA” is that it is an integral part of the ARMS® Suite; which means it can seamlessly integrate with all the other sub-systems of ARMS® Suite thereby offering a truly integrated end-to-end Mobility solution.
AOM from Laminaar Aviation Infotech is an extension of the ARMS® Suite.
Updated on
Apr 11, 2023

Data safety

Safety starts with understanding how developers collect and share your data. Data privacy and security practices may vary based on your use, region, and age. The developer provided this information and may update it over time.
  • No data shared with third parties
    Learn more about how developers declare sharing
  • No data collected
    Learn more about how developers declare collection

What’s new

Bug fixes and performance improvements.
Content rating
Everyone
Learn more

App support

About the developer
LAMINAAR AVIATION INFOTECH (INDIA) PRIVATE LIMITED
rohit.jha@laminaar.in
Tarabai Hall, First Floor, 97, Marine Drive, Mumbai, Maharashtra 400002 India
+91 98677 28244