Transformer Calc - NEC 450

Contains adsIn-app purchases
1+
Downloads
Content rating
Everyone
Screenshot image
Screenshot image
Screenshot image
Screenshot image

About this app

NEC transformer overcurrent protection calculator for electricians, apprentices, and electrical engineers. Size primary and secondary OCPD per NEC Table 450.3(B), calculate full-load amps (FLA), and select conductors from Table 310.16 - all per NEC 2023 (NFPA 70). Works 100% offline on the job site.

Whether you're sizing overcurrent protection for a 75 kVA, 480-to-208V three-phase transformer, or checking if primary-only protection requires 125% or 300%, this calculator gives you accurate NEC-compliant results in seconds. Use it as your go-to transformer protection reference - from kVA rating to OCPD and conductor selection.

TRANSFORMER CALCULATOR FEATURES:
• Primary overcurrent protection per NEC 450.3(B) - 125%/167%/250%/300% rules
• Secondary overcurrent protection per NEC 450.3(B) - 125%/167%/250% rules
• Primary-only and primary+secondary protection methods
• Full-load ampere (FLA) calculation: single-phase and three-phase
• Automatic next-standard-size-up per NEC 240.6(A) with Note 1 logic
• All standard OCPD ratings from 15A to 6000A per NEC 240.6(A)
• Conductor sizing from NEC Table 310.16 (75°C column)
• Copper and aluminum conductor support
• 12 standard kVA ratings from 3 kVA to 1000 kVA
• 5 voltage presets: 120V, 208V, 240V, 480V, 600V
• Single-phase and three-phase support
• NEC article references for every calculation result

NEC REFERENCES INCLUDED:
• NEC Table 450.3(B) - Transformer overcurrent protection (600V or less)
• NEC 450.3(B) Note 1 - Next-size-up rule for primary-only protection
• NEC 240.6(A) - Standard overcurrent device ratings
• NEC Table 310.16 - Conductor ampacity at 75°C

PROTECTION METHOD RULES:
• Primary Only (≤9A): Maximum 167% primary OCPD
• Primary Only (≥9A): Maximum 125% primary OCPD (next size up per Note 1)
• Primary Only (any): Maximum 300% if 125%/167% doesn't correspond to standard size
• Primary + Secondary: Maximum 250% primary, plus 125%/167% secondary OCPD

CALCULATION RESULTS INCLUDE:
• Primary full-load amps (FLA) with formula
• Secondary full-load amps (FLA) with formula
• Primary OCPD size (standard rating per NEC 240.6(A))
• Secondary OCPD size when applicable
• Primary and secondary conductor sizes with ampacity
• Applicable NEC percentage rules and references
• Protection method notes and explanations

PRO FEATURES (one-time purchase):
• No ads - clean interface for professionals
• Save transformer calculation history with labels
• Export calculations as PDF reports for permits and records
• Dark theme support

HOW THE TRANSFORMER CALCULATOR WORKS:
1. Select phase type (single-phase or three-phase)
2. Choose kVA rating from standard sizes
3. Select primary and secondary voltage
4. Choose protection method (primary only or primary + secondary)
5. Select conductor material (copper or aluminum)
6. Get OCPD sizes, conductor recommendations, and NEC references instantly

BUILT FOR ELECTRICIANS ON THE JOB SITE:
This transformer calculator is designed by electricians, for electricians. Enter your transformer parameters, get the correct OCPD size and conductor recommendation instantly - no complicated menus or unnecessary features. One-hand operation, instant results.

PERFECT FOR:
• Licensed electricians sizing transformer protection daily
• Electrical apprentices studying for journeyman exams
• Electrical engineers and designers
• Electrical contractors bidding jobs
• NEC code exam preparation
• Journeyman and master electrician exam study

OFFLINE & PRIVACY:
• Works 100% offline - no internet needed on the job site
• No account required
• No data collection - your calculations stay on your device

Simplify your transformer protection sizing on the job site.
Updated on
Mar 14, 2026

Data safety

Safety starts with understanding how developers collect and share your data. Data privacy and security practices may vary based on your use, region, and age. The developer provided this information and may update it over time.
No data shared with third parties
Learn more about how developers declare sharing
No data collected
Learn more about how developers declare collection

What’s new

Initial release of Transformer Calculator.

• NEC 450.3(B) transformer overcurrent protection sizing
• Primary-only and primary+secondary protection methods
• Full-load ampere (FLA) calculation
• Standard OCPD sizes per NEC 240.6(A)
• Conductor sizing from Table 310.16
• Copper and aluminum support
• Works 100% offline

App support

About the developer
Rizvan Adzhoian
radzhoyan@gmail.com
г. Бишкек, ул М.Алыбаева 19а, кв 31 Bishkek 720006 Kyrgyzstan

More by ZkDev