With EQAsnitch installed in your concrete plant you will have control at source, that is, before your product leaves the plant for construction.
It is therefore a Preventive Control, since a customizable notification system is at your disposal to validate in real time and, effectively, the loading of your dough, completely guaranteeing the manufactured product.
- Non-compliance of cement and a/c with respect to regulations.
- Loading errors.
- Incorrect formulas.
- Errors in scales (included in detail by cycles).
- Inconsistency with formulas approved by the Recipe Manager RD163/19.
- Appearance of new formulas or those with more than 2 years of experience.
- Control of Production per m³, per Ton of cement, by formulas, by environment, by groups of formulas...
- Volume error / m³…
…and we adjust to your needs.