Ridge Line puts you in charge of a mountain transmission crew. Every order rotates between 110 kV, 220 kV and 500 kV spans and takes you through six hands-on field stages.
Pour concrete foundations inside the slump window, lock swinging tower sections into alignment, then ride the tension stringing dual-control where pulling tension and sag fight each other while wire-jump and whipping events strike at random. Observe and trim the sag, drop vibration dampers on their spacing marks, and finish with a high-voltage withstand sampling test.
Settlement pays by sag compliance multiplied by withstand pass rate, so steady hands earn steady coins. Spend them in the workshop shop on six real upgrades: a tension rig that calms the puller, a laser sag meter that projects the target curve, drone stringing that speeds the pull, an anti-whip sheath that absorbs the first event, an online temperature sensor that boosts test results, and a long-term grid contract that fattens every payout.
All progress, gear and settings persist between sessions. No ads, no timers, just you, the ridge and the line.
Build mountain power lines: pour, erect, string and test your way to payout.