AREI Calc calculates everything you need on-site to be inspection-ready — offline, fast, with the formula and the official source included.
FREE
- Voltage drop (mono + 3-phase, Cu/Al) with APPROVED/REJECTED stamp
- Cable cross-section according to Table 4.11 (Book 1)
- Differential selection (sensitivity + type)
PRO (one-time)
- Conduit filling, circuit breaker and cross-section, charging station circuit (Book 1 Chapter 7.22)
- All formulas + AREI references
- Inspection checklist, room by room
FOR THOSE SELLING OR RENOVATING
- Interactive inspection checklist
- What is checked + what is new (2025/26)
Full NL and FR. Dark (construction site) and day (office). No account, no internet required.
Indicative calculations. Always consult the AREI and a recognized inspection body.
Voltage drop, cable cross-section & differential — calculation for inspection readiness, offline.