On the 2026 NEC. Twenty tools, every answer showing its work.
Plan a 400-foot pull and watch the app draw the run, bend by bend, with tension and sidewall pressure at every elbow and a warning before your cables jam. Size a pull box and get the knockout layout for every wall, dimensioned for the crew to punch. Size a transformer and get the one-line, every conductor and bonding jumper labeled.
Built by a master electrician with 40 years in the trade. Every answer shows the inputs, the math step by step, the code sections behind it and a drawing of what was calculated. Share any result as a PDF for a GC, engineer or inspector.
A "?" note on every input — 388 of them: what it is, where to find the figure, why it matters, and the section. Nobody needs to memorize the code; what matters is knowing when to look something up, and where.
Leave a required figure blank and the answer reads Incomplete — a figure you didn't enter is never treated as zero. Three worked examples on every tool, most from real jobs.
PULL TENSION
• Lay the run out as you'd walk it: up 30 ft, 90° left, 150 ft level, a kick, down into the gear
• Tension at every bend, peak sidewall against the maker's limit, and which end to pull from
• Jam ratio checked, with a to-scale cross-section of the cables in the pipe
• THHN and XHHW-2 weights from the maker's data, lubricant friction built in
PULL BOXES AND KNOCKOUTS
• Straight, angle and U pulls, with real hole-saw sizes
• Every hole center from the edges, with room for Myers hubs, grounding-bushing lug swing and the puller's coupler — every gap labeled with the rule behind it
CONDUIT, WIREWAY AND FEEDERS
• Conduit fill drawn to scale, conductors in their real system colors
• Wireway fill with the 20% and splice rules
• Feeder sizing: ambient correction, rooftop runs, more than three current-carrying conductors, parallel sets, the 10 ft rule, voltage drop by Chapter 9 Table 9
SOLAR PV
• String, microinverter and optimizer systems, on a one-line
• Cold-weather voltage, the 600 V dwelling limit, the busbar rule
• Written for electricians who aren't solar specialists
TRANSFORMERS, SERVICES AND TAPS
• Transformer sizing: primary and secondary protection, bonding jumpers, GEC
• Service sizing: conductors, the main, ground-fault protection where required, MBJ and GEC
• Feeder taps: the 10 ft, 25 ft and outside rules, every condition checked. If one fails it says why and what to change
MOTORS, GENERATORS AND FIRE PUMPS
• Motor circuits drawn from breaker to overloads
• Generators: conductor sizing, and 3-pole versus 4-pole transfer switch bonding
• Fire pumps: the one circuit built backwards on purpose — locked-rotor protection, no overloads
GROUNDING AND BONDING
• GEC to each electrode, jumper sizes, ground rod rules, and a drawing of the system
• A common-violations list, including aluminum GECs too close to earth
ELECTRICAL SAFETY — NFPA 70E-2027
• Shock and arc flash boundaries drawn to scale
• PPE by the table method or off the label, and the job briefing
• An emergency page for when something has gone wrong
CODE FINDER
• Type what you're working on — "ground rod", "outside tap", "ufer" — and get the sections to read
• The whole 2026 NEC: every article, section and subsection, Chapter 9, and all 821 Article 100 definitions, each with a plain-language pointer
• Trade words welcome, misspellings forgiven. It says where to look, never reproducing the code text
MORE
• Fault current, duct banks, cords, installation standards, reference tables
• Field testing: megger testing with an isolation checklist, ground resistance
BUILT FOR THE FIELD
• Works offline — no signal needed in a basement or pump room
• Save jobs and reopen them later
• For systems 600 V and below
YOURS TO KEEP
Pay once and it's yours. No ads, no subscription, no account. Your jobs stay on your phone, and nothing you enter is collected, sold or shared.
Not a substitute for a licensed engineer. Every result shows its work so you can check it.
2026 NEC calculations for electricians. The working, the code sections, a PDF.