This user-friendly software is designed to assist with power distribution system design, making it convenient for electrical technicians and engineers to use on the go.
※ Based on the latest Taiwan regulations, "User Electrical Equipment Installation Rules," released on May 9, 2025.
The auxiliary tools include:
* Load current calculation
* Conductor amperage (Tables 25-2, 25-3, 25-4, and 25-5)
* Voltage drop calculation (The voltage drop of the low-voltage main line and its branches shall not exceed 3% of the nominal voltage, and the total shall not exceed 5%)
* Conductor conduit selection (For conductors of the same diameter running in the same conduit, refer to Tables 328-1, 328-2, and 343-1)
* Conductor cross-sectional area calculation (For conductors of different diameters running in the same conduit, refer to Tables 328-6, 328-7, and 343-4)
* Grounding wire diameter lookup (For grounding wires for separate grounding of electrical equipment or connecting wires for grounding of electrical equipment and the internal wiring system, refer to Table 93-2)
* Recommended copper busbar specifications
* Power factor improvement calculation (Capacitor capacity should be designed to improve the power factor to 95%)
* Duty cycle and rated current percentage of discontinuously operating motors (Table 214)
* Low-voltage short-circuit fault current calculation (using 3 Type combinations, fault current estimation can be completed for various low-voltage systems below 600V)
* Indoor enclosure size reference specifications
◆ Disclaimer
1. The calculation results of this program are simulated estimates based on user input data and built-in formulas and tables, and are only for auxiliary reference in power distribution design, on-site estimation, and data verification.
2. This program is mainly based on the relevant content of the "User Electrical Equipment Installation Rules" issued on May 9, 2025. If regulations, standards, design conditions, or engineering specifications have been updated, please refer to the latest announcements from the competent authority and the actual design documents.
3. This program cannot replace the judgment, approval, review, and legal responsibility of electrical technicians, electrical engineers, or related professionals.
4. Users should verify the reasonableness of the input data, calculation conditions, applicable regulations, and results themselves. The developer shall not be liable for any damages, disputes or losses arising from the use of this program, the citation of its calculation results, or its use as the basis for design, construction, procurement or acceptance without verification.