On the delayed failure of geotechnical structures in low permeability ground: IGT

· vdf Hochschulverlag AG
电子书
226
符合条件

关于此电子书

Tunnelling, Tunnel Jacking, Ground Stability, MC Model, MCC ModelThis thesis investigates the problem of time-dependent stability of geotechnical structures (such as trenches or tunnels) in medium- to low-permeability water-bearing grounds, typically clayey or silty soils. The peculiarity of these soils is that they respond to excavation with a delay. The time-dependency can be traced back to the swelling process triggered by the dissipation of the excavation-induced negative excess pore pressures. Unstable conditions may necessitate improvement or reinforcement of the ground or the application of a support (e.g. by compressed air or pressurized bentonite slurry in the case of tunnel face). As such measures may present economical and operational disadvantages, the question of whether and for how long the excavation can remain stable without support is of great practical relevance. The stand-up time (time lapsing between end of the excavation and the occurrence of failure), and thus the feasibility of refraining from ground reinforcement, improvement or support, depends essentially on soil strength and permeability.

The goal of the thesis is to develop a computational method that allows the estimation of the stand-up time, and thus improve construction safety and economy. The main objectives towards this goal are:

analysis of the mechanism of delayed failure by means of fully coupled hydraulic-mechanical continuum-mechanical simulations, investigation into the role of the constitutive behaviour of the ground (particularly that of plastic dilation), anddevelopment of a practical method of dealing with the numerical problem of mesh-sensitivity which occurs due to the localization of deformations when assuming non-associated plasticflow in any geotechnical structure at failure;planning and performing experiments and validation of the computational method and assumptions; systematic investigation of the stand-up time of the tunnel face and working-out of design charts.

 

为此电子书评分

欢迎向我们提供反馈意见。

如何阅读

智能手机和平板电脑
只要安装 AndroidiPad/iPhone 版的 Google Play 图书应用,不仅应用内容会自动与您的账号同步,还能让您随时随地在线或离线阅览图书。
笔记本电脑和台式机
您可以使用计算机的网络浏览器聆听您在 Google Play 购买的有声读物。
电子阅读器和其他设备
如果要在 Kobo 电子阅读器等电子墨水屏设备上阅读,您需要下载一个文件,并将其传输到相应设备上。若要将文件传输到受支持的电子阅读器上,请按帮助中心内的详细说明操作。