Practical Tunnelling: Explaining in Detail the Setting Out of the Works, Shaft-sinking and Heading-driving, Ranging the Lines and Levelling Under Ground, Sub-excavating, Timbering, and the Construction of the Brickwork of Tunnels; with the Amount of Labour Required For, and the Cost Of, the Various Portions of the Work
Frederick Walter Simms