* Energy management: Extension of §14a with adjustments to the power limitation of all participants during commissioning
* Setting the correct gas type at the end of a spare part exchange of the BCU
* Note on switching off the burner in the event of a parameter update for gas devices
* Fix for BCU parametrization failure that leads to F.454 “FailureSoftwareConfiguration”