Construction Delays: Edition 3

· · ·
· Butterworth-Heinemann
eBook
418
페이지
적용 가능

eBook 정보

Construction Delays, Third Edition, provides the latest specialized tools and techniques needed to avoid delays on construction projects. These include institutional, industrial, commercial, hi-rise, power and water, transportation and marine construction projects. Most other references provide only post facto construction delay analysis. This update includes 18 chapters, 105 sections and approximately 100 new pages relative to the second edition.
  • Features greatly expanded discussion of the project management concerns related to construction delays, including a more comprehensive discussion of the development and review of the project schedule
  • Offers a detailed analysis of the strengths and weaknesses of the most common construction delay approaches and how they should be properly deployed or avoided
  • Includes significant discussion of the contract provisions governing scheduling, the measurement of delays and payments for delay
  • Includes numerous real world case studies

저자 정보

Mark is a recognized expert regarding the analysis of Critical Path Method (CPM) schedules. He’s a qualified expert witness. Mark was a contributing author and continues to provide updates and revisions to the AACE International’s (AACEi) Recommended Practice No. 29R-03 for Forensic Schedule Analysis (RP-FSA. He writes and speaks nationally and internationally on construction claim topics. Mark uses his expertise to help his client’s prepare, evaluate, and analyze delays, inefficiencies, acceleration, and damages on projects including transportation, power, medical, education, commercial, and high-rise buildings across the US and internationally.

William A. Manginelli has extensive experience in project management, scheduling, construction change analysis, and surety completion on many types of projects including institutional, industrial, commercial, hi-rise, power and water, transportation, and marine construction. His expertise lies in the areas of construction management and the analysis of construction impacts, including delays, inefficiency, acceleration, and damages.

Scott Lowe, P.E., has directed and performed all types of analyses related to claims including delay and inefficiency (typically using measured mile for inefficiency); assessed responsibility for contract changes; and calculated various types of delay damages. He has evaluated problems and offered solutions on almost every type of project including transportation, water and wastewater treatment, power, process and manufacturing, medical, educational, commercial, correctional, hotels, condominiums, residential, and athletic facilities. He has worked on projects large and small throughout the US and internationally.

A nationally recognized construction expert in scheduling, construction management, cost overruns/damages, construction means and methods, and delay and inefficiency analysis, Ted has either managed construction or evaluated problems on virtually every type of project including transportation, water/wastewater treatment, power, process and manufacturing, medical, educational, commercial, correctional, hotels, condominiums, residential housing, and athletic facilities.

이 eBook 평가

의견을 알려주세요.

읽기 정보

스마트폰 및 태블릿
AndroidiPad/iPhoneGoogle Play 북 앱을 설치하세요. 계정과 자동으로 동기화되어 어디서나 온라인 또는 오프라인으로 책을 읽을 수 있습니다.
노트북 및 컴퓨터
컴퓨터의 웹브라우저를 사용하여 Google Play에서 구매한 오디오북을 들을 수 있습니다.
eReader 및 기타 기기
Kobo eReader 등의 eBook 리더기에서 읽으려면 파일을 다운로드하여 기기로 전송해야 합니다. 지원되는 eBook 리더기로 파일을 전송하려면 고객센터에서 자세한 안내를 따르세요.