All unit models were connected to a process flowsheet and simulated dynamically. The simulation results were compared to experimental data from a 25 kWth pilot plant operated at the university by the author. It could be shown that a detailed and dynamic simulation of the whole process can be carried out over a time period of more than 45 minutes and the experimental results from start-up, steady state operation and shutdown of the plant were predicted accurately.