Make-to-Order Assembly Management

· Springer Science & Business Media
ספר דיגיטלי
260
דפים

מידע על הספר הדיגיטלי הזה

Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc.

רוצה לדרג את הספר הדיגיטלי הזה?

נשמח לשמוע מה דעתך.

איך קוראים את הספר

סמארטפונים וטאבלטים
כל מה שצריך לעשות הוא להתקין את האפליקציה של Google Play Books ל-Android או ל-iPad/iPhone‏. היא מסתנכרנת באופן אוטומטי עם החשבון שלך ומאפשרת לך לקרוא מכל מקום, גם ללא חיבור לאינטרנט.
מחשבים ניידים ושולחניים
ניתן להאזין לספרי אודיו שנרכשו ב-Google Play באמצעות דפדפן האינטרנט של המחשב.
eReaders ומכשירים אחרים
כדי לקרוא במכשירים עם תצוגת דיו אלקטרוני (e-ink) כמו הקוראים האלקטרוניים של Kobo, צריך להוריד קובץ ולהעביר אותו למכשיר. יש לפעול לפי ההוראות המפורטות במרכז העזרה כדי להעביר את הקבצים לקוראים אלקטרוניים נתמכים.